STACK TKY01B
Data center

STACK TKY01B

STACK TKY01B, operated by STACK Infrastructure, is listed as data center in Inzai, Chiba, Japan.

Inzai, Chiba, Japan

OperatorSTACK Infrastructure
StatusUnder construction

Overview

STACK TKY01B, operated by STACK Infrastructure, is listed as data center in Inzai, Chiba, Japan. Current status: under construction. The recorded expected completion is 2027. Published capacity is 18 MW. Published scale information: building area 228,000 sq ft. It is associated with STACK TKY01 Campus.

Map precision: City-level. The marker does not identify an exact building.

Facility details

Building Name
TKY01B
Entity Type
Facility
Facility Type
Data center
Classifications
Hyperscale, AI infrastructure

Physical location

City
Inzai
State / Region
Chiba
Country
Japan
Country Code
JP
Location Precision
City-level

Development timeline

Development Status
Under construction
Expected Completion
2027

Capacity and scale

Power Capacity (MW)
18 MW
Building Area
228,000 sq ft

Relationships

Operator
STACK Infrastructure Checked 2026-09-07
Campus
STACK TKY01 Campus Checked 2026-09-07

Relationships without an Evidence link are normalized from the canonical directory record. They should not be interpreted as independent proof of physical presence or request origin.

Changes

  1. Expected completion 2027 · Under-construction

This timeline records selected public-field transitions after Botcrawl established the 4.28 history baseline. It is not a complete reconstruction of changes made before that baseline.

Nearby Data Centers

Data centerOperational

STACK TKY01A

STACK Infrastructure

Inzai, Chiba, Japan

18 MW documented capacity

Data centerUnder construction

STT Tokyo 2

STT GDC

Inzai, Chiba Prefecture, Japan

38 MW documented capacity

Data centerOperational

STT Tokyo 1

STT GDC

Inzai, Chiba Prefecture, Japan

32 MW documented capacity

Interconnection facilityOperational

IIJ Shiroi DCC

Internet Initiative Japan Inc.

Shiroi-shi, Chiba-ken, Japan