Overview
Crusoe Abilene Microsoft AI Factory Campus, operated by Crusoe, is listed as data center in Abilene, Texas, United States. Current status: under construction. The recorded expected completion is 2027. Published capacity is 900 MW.
Location
Map precision: City-level. The marker does not identify an exact building.
Facility details
- Entity Type
- Campus
- Facility Type
- Data center
- Classifications
- Hyperscale, AI infrastructure
Physical location
- City
- Abilene
- State / Region
- Texas
- Country
- United States
- Country Code
- US
- Location Precision
- City-level
Development timeline
- Development Status
- Under construction
- Expected Completion
- 2027
- Expansion / Conversion Details
- Separate 900 MW two-building campus adjacent to Crusoe's original Abilene infrastructure, developed to support Microsoft AI workloads.
Capacity and scale
- Power Capacity (MW)
- 900 MW
Relationships
- Operator
- Crusoe Checked 2026-09-07
Relationships without an Evidence link are normalized from the canonical directory record. They should not be interpreted as independent proof of physical presence or request origin.
Changes
-
Expected completion 2027 · Under-construction
This timeline records selected public-field transitions after Botcrawl established the 4.28 history baseline. It is not a complete reconstruction of changes made before that baseline.